The Dry Lake wind farm project was 65MW using 31 D Suzlon turbines. 534

This Right Of Way Wind Development Grant falls under U.S. Code Title 43 Public Lands; Section 1761; Statute 090; Page 2776. Whether it is filing a zone or researching one, the administering BLM office is going to be the definitive source. The turbines at this wind power project generate 127 megawatts (MW) of clean, renewable energy. }); {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","geoservice":"geonames","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"tilt":0,"imageoverlays":[],"kml":[],"gkml":[],"fusiontables":[],"searchmarkers":"","enablefullscreen":false,"locations":[{"text":"","title":"","link":"","lat":34.635651,"lon":-110.357351,"icon":""}]}, {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","geoservice":"geonames","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":6,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"tilt":0,"imageoverlays":[],"kml":[],"gkml":[],"fusiontables":[],"searchmarkers":"","enablefullscreen":false,"locations":[{"text":"","title":"","link":"","lat":34.635651,"lon":-110.357351,"icon":""}]}, OpenEI is developed and maintained by the, Wind Energy Data and Information Gateway (WENDI), https://openei.org/w/index.php?title=Dry_Lake_II_Wind_Farm&oldid=960921. Lua error in Module:Coordinates at line 668: callParserFunction: function "#coordinates" was not found. Search for owners by first name, last name, company, location, etc. Solar. Federal Land Policy and Management Act (FLPMA). 63  MW The wind farm includes 30 wind turbines situated on less than two percent of the project’s site, leaving the majority of land available for cattle grazing.

min-height:425px; 000 } Wind farm name: Dry Lake; Country: USA; County / Zone: Arizona; Details. The wind farm includes 30 wind turbines situated on less than two percent of the project’s site, leaving the majority of land available for cattle grazing.

The Dry Lake Wind Power Project in Navajo County is the first and the largest utility-scale wind farm in the U.S. state of Arizona.Starting in 2009, it was constructed in two phases having a total generating capacity of 128.1 megawatts (MW), and is selling the electricity to the Salt River Power District (SRP). Arizona's first modern, commercial-scale wind farm is in the high desert countryside of Navajo County. AZA3325902 IS ROAD ROW FOR DRY LAKE II WIND FACILITY, 09/2009 - PHASE 1 - 2.1 MW PER TRBN - 10 TRBNS, ON BLM-MANAGED LANDS, 11 TRBNS ON PVT LAND, &. We evaluated the National Registry eligibility of 33 archaeological sites, surveyed more than 2,000 acres for cultural resource assets, evaluated habitat and potential land use conflicts, and described geologic and soil conditions in the project area. Major portions of the project are on federally managed lands, requiring environmental reviews under the National Environmental Policy Act (NEPA). will be about seven miles (11 km) northwest of Snowflake and three miles (5 km) east of phase 1.[4]. This page was last modified on 17 August 2018, at 12:15. Ownership and use of this zone is overseen by the Bureau of Land Management's Safford Field Office under the serial number AZA 033259. 12/28/2016 NOTICE SENT FOR RENTAL ADJUSTMENT, Dry Lake Wind Farm Wind Energy Right Of Way. LOCATION: Quay County, New Mexco.

Depending on actual performance of phase 1, the company planned to install up to 209 more turbines in future construction phases. [2] Iberdrola Renewables built the wind farm for $100 million. Second largest project in New Mexico; Began construction before the extension of the PTC’s; Utilized Industrial Revenue Bonds to bring large savings to the project; SERVICES PROVIDED: Development and Turnkey EPC. Our team conducted a series of studies, reports, surveys and reviews that paved the way for installation of the 412-foot-tall wind turbines. Dry Lake Il Solar North of Snowflake approximately 4 miles 75.7 Special Use Permit to allow Aurora Solar to place a photovoltaic (solar) electrical generating facility within a portion of the Dry Lake Il wind farm. 15,323 megawatts 101 projects. Browse zone owners by state in the United States of America, Browse owners by category (corporation, agency, private), Browse owners by interest relationship (partner, holder, agent, etc.). Caprock Wind Ranch® Quay County, NM. × Starting in 2009, it was constructed in two phases having a total generating capacity of 128.1 megawatts (MW), and is selling the electricity to the Salt River Power District (SRP). Sturgeon Electric Company, Inc., a sub-sidiary of MYR Group Inc., was selected by Iberdrola to construct a new 69kV/34.5kV substation and col-lector system for Phase II. Wind farms databases; National reports; Offshore market; Players databases; Manufacturers and turbines; GlobalData Reports; Online access . }); http://iberdrolarenewables.us/video/video-drylake.html, http://www.srpnet.com/environment/windfarm.aspx, "SRP Buys Entire Output of Iberdrola Renewables' Dry Lake 2 Wind Power Project", "Economic Benefits, Carbon Dioxide (CO2) Emissions Reductions, and Water Conservation Benefits from 1,000 Megawatts (MW) of New Wind Power in Arizona", https://infogalactic.com/w/index.php?title=Dry_Lake_Wind_Power_Project&oldid=5431710, Buildings and structures in Navajo County, Arizona, Creative Commons Attribution-ShareAlike License, About Infogalactic: the planetary knowledge core, Wellton-Mohawk Irrigation and Drainage District, Sulphur Springs Valley Electric Cooperative. , background:rgba(0,0,0,0.8); Iberdrola Renewables brought us on board to help conduct environmental reviews for a commercial-scale wind power project crossing 6,000 acres in Navajo County, Arizona. 51 Around 2003, rancher Bill Elkins began working with Northern Arizona University scientists to erect measurement towerson his land to measure wind speeds. SIZE: 80 MW. the power generated by both phases of the Dry Lake Wind Farm. According to the USDOE, each 1000 MW of wind power capacity installed in Arizona will save 818 million US gallons (3,100,000 m3) of water per year and eliminate 2.0 million tons of carbon dioxide emissions. Around 2003, rancher Bill Elkins began working with developer John Gaglioti and Northern Arizona University scientists to erect measurement towers on his land to measure wind speeds. 3 / 6. , The Dry Lake Wind produces enough renewable energy to power 15,000 homes in the Phoenix metropolitan area.

Discover wind power leasing activity in your area and find new regions of opportunity.

9 TRBNS ON AZSLD LAND FOR A TOTAL OF 63 MW.

The data are dynamic and may change over time. Our team conducted a series of studies, reports, surveys and reviews that paved the way for installation of the 412-foot-tall wind turbines. He studied the local power grid to determine the feasibility of connecting a wind farm. , 000

We're always looking for great talent to join our global teams. Based on wind measurements before construction began, Iberdrola estimates phase 1 will produce an average of 132,450 MWh annually.

Description: The Dry Lake Wind Power Project, located near Heber, Ariz., is the state's first commercial-scale wind farm.